5 Marla House Construction Cost in Pakistan (2026 – Easy Guide)

Building your own house is a big dream for many families in Pakistan. A 5 marla house is one of the most popular choices because it is affordable and suitable for small and medium families. In 2026, construction costs have increased due to higher prices of materials, labor, and utilities.
This article explains the complete construction cost of a 5 marla house in Pakistan in 2026 in very simple English, step by step.
What Is a 5 Marla House?
A 5 marla house usually has:
- 2 or 3 bedrooms
- A TV lounge
- A kitchen
- Bathrooms
- A small garage
- Sometimes a small terrace
Total covered area is normally 1,000 to 1,200 square feet, depending on the design.
Average 5 Marla Construction Cost in 2026
In 2026, the average cost to build a standard 5 marla house in Pakistan is:
👉 PKR 4.5 million to PKR 6.5 million
This cost depends on:
- City (Lahore, Islamabad, Multan, Karachi, etc.)
- Quality of materials
- Labor rates
- House design
- Finishing level
Construction Cost Per Square Foot (2026)
In 2026, average construction cost is:
- Grey structure: PKR 2,800 – 3,500 per sq ft
- Complete house: PKR 4,500 – 6,000 per sq ft
Step-by-Step Cost Breakdown (5 Marla House)
Below is an easy cost breakdown so anyone can understand.
1. Grey Structure Cost
Grey structure means the basic structure of the house without paint, tiles, doors, or fittings.
Grey Structure Includes:
- Foundation
- Walls
- Roof slab
- Cement, bricks, sand
- Steel (sarya)
- Basic plumbing & wiring
Grey Structure Cost (2026):
👉 PKR 2.8 to 3.5 million
2. Finishing Cost
Finishing is what makes your house look beautiful and livable.
Finishing Includes:
- Tiles & marble
- Paint
- Doors & windows
- Kitchen cabinets
- Bathrooms fittings
- Electrical switches & lights
Finishing Cost:
👉 PKR 1.7 to 3 million
Material Cost Details (Easy Table)
Cement
- Price: PKR 1,350 – 1,500 per bag
- Used heavily in foundation and roof
Bricks
- Price: PKR 16 – 18 per brick
- Needed in large quantity
Steel (Sarya)
- Price: PKR 260 – 290 per kg
- One of the most expensive items
Sand
- Price: PKR 45 – 65 per cubic foot
Crush (Bajri)
- Price: PKR 90 – 120 per cubic foot
Labor Cost in 2026
Labor rates have increased in 2026.
Average Labor Charges:
- Grey structure labor: PKR 900 – 1,100 per sq ft
- Finishing labor: PKR 1,000 – 1,500 per sq ft
Total labor cost is usually 20% to 25% of total construction cost.
Electrical Work Cost
Includes:
- Wiring
- Switch boards
- Lights
- Fans
Cost:
👉 PKR 250,000 – 400,000
Plumbing & Sanitary Cost
Includes:
- Water pipes
- Sewer pipes
- Wash basins
- Toilet seats
- Showers
Cost:
👉 PKR 300,000 – 500,000
Doors & Windows Cost
Depends on material quality.
- Wooden doors (local): PKR 40,000 – 60,000 each
- Aluminum windows: PKR 150,000 – 250,000 total
Kitchen Cost
Kitchen cost depends on size and material.
- Basic kitchen: PKR 200,000
- Medium quality kitchen: PKR 350,000
- High quality kitchen: PKR 500,000+
Bathroom Cost
For 3 bathrooms:
👉 PKR 250,000 – 450,000
Paint Cost
Includes labor + paint.
- Local paint: PKR 120 – 150 per sq ft
- Branded paint: PKR 180 – 250 per sq ft
Total paint cost:
👉 PKR 200,000 – 350,000
City-Wise Cost Difference
Lahore / Islamabad
- Slightly higher labor & material cost
Multan / Faisalabad
- Medium cost
Smaller Cities
- Lower labor cost
Low-Budget vs High-Budget 5 Marla House
Low-Budget House
👉 PKR 4.5 – 5 million
- Simple tiles
- Local fittings
- Basic design
Medium-Budget House
👉 PKR 5.5 – 6 million
- Better tiles
- Imported fittings
- Modern look
High-Budget House
👉 PKR 6.5 million+
- Imported tiles
- Fancy ceilings
- Luxury fittings
Tips to Reduce Construction Cost
- Make a simple design
- Buy material in bulk
- Avoid unnecessary luxury items
- Hire an experienced contractor
- Monitor construction regularly
Common Mistakes to Avoid
- Changing design again and again
- Buying low-quality material
- Not checking labor work
- No proper budget planning
Is 2026 a Good Time to Build a House?
Yes, but planning is very important. Prices are high, but building your own house is still better than buying a ready-made house because:
- You control quality
- You manage cost
- You design as you like
Final Words
In 2026, the total cost of building a 5 marla house in Pakistan ranges from PKR 4.5 million to PKR 6.5 million, depending on material quality, city, and finishing level.
With proper planning, smart buying, and honest labor, you can build a strong and beautiful home within budget.