Total expense of net metering installation in Pakistan in 2025 is approximately PKR 150,000, it help to low bills & supports a sustainable energy future.

DetailsCost (PKR)
Sanction load approval  (Single Phase to Three phase )30000
Document File from AEDB (Alternative Energy Development Board )Certified35000
Green Meter40000
Three phase cable10000
Additional costs35000
Total Cost150,000 Approximately

Apply Process

Eligibility Criteria

  1. Connection Type:
    • Three-Phase
  2. Solar System Capacity:
    • 1 kW to 1000 kW
  3. Maximum Solar Limit:
    • 1.5 times the approved load
  4. Voltage Range:
    • 400V – 11kV
  5. Eligible Consumers:
    • Residential, Commercial, Industrial, Bulk, General Services.

Required Documents:

  • Copy of last month’s electricity bill.
  • Interconnection agreement between Solar Generator and PIEDMC.

Benefits

  • Low electricity bills.
  • No need for battery storage.
  • Reduces pressure on the power grid.
  • Helps reduce environmental pollution.
  • Increases awareness of energy usage.