Green Meter Price in Pakistan Net Metering full Process

Total expense of net metering installation in Pakistan in 2025 is approximately PKR 150,000, it help to low bills & supports a sustainable energy future.
Details | Cost (PKR) |
---|---|
Sanction load approval (Single Phase to Three phase ) | 30000 |
Document File from AEDB (Alternative Energy Development Board )Certified | 35000 |
Green Meter | 40000 |
Three phase cable | 10000 |
Additional costs | 35000 |
Total Cost | 150,000 Approximately |
Apply Process

Eligibility Criteria
- Connection Type:
- Three-Phase
- Solar System Capacity:
- 1 kW to 1000 kW
- Maximum Solar Limit:
- 1.5 times the approved load
- Voltage Range:
- 400V – 11kV
- Eligible Consumers:
- Residential, Commercial, Industrial, Bulk, General Services.
Required Documents:
- Copy of last month’s electricity bill.
- Interconnection agreement between Solar Generator and PIEDMC.
Benefits
- Low electricity bills.
- No need for battery storage.
- Reduces pressure on the power grid.
- Helps reduce environmental pollution.
- Increases awareness of energy usage.